John Cooper, Kate Lawrence, Adrian Vanderplank and Jude Vanderplank. Cooler today at 18°C but no real breeze. Kate to the bottom to remove a frog and other critters then was joined by John who explained where he going to drill. Kate then ascended and John drilled a line of 8 holes on the West wall above the floor, the intention being to widen enough to work. John then came out and Adrian descended to charge the holes, 3.5m of 40gm. Meanwhile John retrieved the mattock and spade from the upper level before running the wire down behind the fixed ladder. The double builders ladder was then raised above shrapnel range and Adrian completed the set up before coming out. There should now be spoil for Saturday. 2 hours. John.