Saturday, February 1, 2025

Saturday 1st February 2025

John Cooper, Nigel Graham, Pete Hann, Kate Lawrence, Adrian Vanderplank and Jude Vanderplank. Started with Kate exposing the slab of rock which she slid over last week to get into the old dig. Adrian then went down and capped it, assisted at times by Kate. Once completed the bits were brought to the surface for future wall building. With Adrian and the capping kit out Kate went back and a total of 30 loads of mud were extracted and transferred into the large bucket. The bottom ladder was removed and replaced several times today. Some bone ribs came out with the mud. 3 hours. John.

No comments:

Post a Comment