John Cooper, Pete Hann and Kate Lawrence. Double mix of cement
used by Pete getting rid of the lovely building rocks created Thursday. Four
buckets of mud and 2 of small rocks hauled out. We removed the bottom ladder
whilst Pete was walling which also allowed an easier haul. New wall reached old
wall on left hand side but still a gap on right. Measured depth at 7.65m. This
is less that when last measured! Probably a combination of a more vertical
plumb now being possible and John refusing to let Pete measure into the gloopy
puddle on the floor. 1½ hours. John.