John Cooper, Nigel Graham, Pete Hann, Kate Lawrence, Adrian Vanderplank and Jude Vanderplank. Full team today. 40 loads of mud hauled out and left in big bucket. Five loads of rubbish and 1 load of rock also removed. Another session like today should see us needing Pete to build his wall up. 2½ hours. John.

Big bucket on newer tractor. Photo JV.

Saturday, April 19, 2025

Saturday 19th April 2025

John Cooper, Nigel Graham, Pete Hann, Kate Lawrence and Adrian Vanderplank. Reduced team again today but still worked hard and lifted 40 loads of mud, 5 buckets of rock, 3 frogs and 1 toad out. Filled the large tractor bucket. 2½ hours. John.

Looking down entrance shaft. Photo AV.

Saturday, April 12, 2025

Saturday 12th April 2025

John Cooper, Pete Hann, Kate Lawrence and Jude Vanderplank. Reduced team today but still worked hard and lifted 40 loads of mud and a rock out. Filled the large tractor bucket as it’s an uprated tractor! 2 hours. John.

Saturday, April 5, 2025

Saturday 5th April 2025

John Cooper, Nigel Graham, Pete Hann, Kate Lawrence, Adrian Vanderplank and Jude Vanderplank. Adrian did 2 sessions capping rock, the second being a single large chunk from the bang on Tuesday. Pete did 1 session wall building (3 mixes of cement) which also entailed hauling 2 loads of mud from his wall base. Kate cleared up at the end with 13 loads of rock and 1 load of gravel hauled out. 3 hours in the sunshine. John.

Tuesday, April 1, 2025

Tuesday 1st April 2025

John Cooper, Kate Lawrence, Adrian Vanderplank and Jude Vanderplank. Assisted by Kate, John drilled a row of 5 x 10mm holes 900mm deep vertically into the ledge on the West wall. Adrian then charged them, topped up the holes with water to act as stemming and, after removing the bottom ladder which is now heavier, destroyed them. Should be some rock for Pete to continue wall building at the South end of the entrance shaft on Saturday. 1½ hours. John.