John Cooper, Nigel Graham, Pete Hann, Kate Lawrence, Adrian
Vanderplank and Jude Vanderplank. Three mixes of cement today all used by Pete
building retaining wall. About 12 loads of mud hauled out as well. Pete
practiced dodging large boulder lowered by John in an uncontrolled manner.
Really need a boulder net for the ones too big for the bucket! 1 fat frog and 1 small newt rehomed today. 2 hours. John.
Saturday, December 28, 2024
Saturday 28th December 2024
Saturday, December 21, 2024
Saturday 21st December 2024
John Cooper, Nigel Graham and Pete Hann with Kate Lawrence collecting and supplying suitable building rocks. Jude Vanderplank dropped off 4 bags of sand before returning home to assist Adrian with chainsaw work. Double double mix of cement used building up the lower wall in the South end of the entrance rift to hold back mud. One more session should see the two walls joined up and the top one raised. 1½ hours. John.
![]() |
Surface. Photo Kate Lawrence. |
![]() |
First Ladder. Photo Kate Lawrence. |
![]() |
Pete Wall Building. Photo Kate Lawrence. |
Saturday, December 14, 2024
Saturday 14th December 2024
John Cooper, Nigel Graham and Pete Hann. Double mix of cement
used cementing up a lower wall in the South end of the entrance rift to hold
back mud. Another couple of sessions before the lower wall reaches the upper
wall done last week. Probably do a double double mix next time. Adrian and Jude
chainsaw work whilst Kate Lawrence cooking Christmas lunch for us all. 1½ hours. John.
Saturday, December 7, 2024
Saturday 7th December 2024
John Cooper, Nigel Graham, Pete Hann and Kate Lawrence. Double
mix of cement used cementing up a wall in the South end of the entrance rift to
hold a boulder in place. 1 hour. John.